CASE STUDY

Enbridge Inc.

Enbridge Centre, Edmonton — New Build

A flexible, future-proof IT and acoustic infrastructure for a 15-floor headquarters — delivered on a tight 9-month timeline.

PROJECT SNAPSHOT

CLIENT

Enbridge Inc.

LOCATION

Enbridge Centre, Edmonton

PROJECT TYPE

New Build — IT Integration

SCALE

15 floors / 300,000 sq ft

SCOPE

Prefabricated structured cabling, sound masking, kit of parts desktop IT integration

Timeline

9 months

Key Outcome

48-hour reconfigurability — zero disruption to operations

Enbridge Centre, Edmonton — New Build

EXECUTIVE SUMMARY

Enbridge’s new Edmonton headquarters demanded an office environment that could evolve as fast as the business itself — walls, workstations, and acoustics all reconfigurable within a single weekend. Tekena designed and delivered a fully prefabricated, off-site assembled solution spanning 300,000 sq ft across 15 floors, completed within a demanding 9-month schedule. The result is a dynamic, future-proofed workplace that Enbridge sees as the model for its locations to come.

THE CHALLENGE

The Enbridge Edmonton Centre team set out with a clear and ambitious vision: a workplace built for change. The space needed to support a modern, dynamic workforce — one that could be reconfigured quickly as business needs shifted. Specific requirements included:

  • The ability to move walls, shuffle teams, and reconfigure floors with minimal disruption to daily operations.
  • Full end-user control of sound masking across all 15 floors from a single network device.
  • A complete weekend turnaround capability — shut down Friday night, reopen Monday morning with cabling, sound masking, walls, and furniture all changed within 48 hours.
  • Delivery on a tight 9-month schedule that many bidders said couldn’t be met.
Were we capable of doing the changes to both the sound masking and the structured cabling systems, as well as the wall systems and furniture for the staff — within a 48-hour timeframe?

— Project Manager, Enbridge

THE SOLUTION

Tekena recommended and designed a fully off-site assembled, prefabricated approach engineered specifically for flexibility and rapid reconfiguration:

  • Prefabricated structured cabling — a modular data communications platform that can be expanded, reconfigured, or relocated as Enbridge's office needs evolve.
  • Sound masking — networked acoustic control across all 15 floors, managed centrally from a single laptop.
  • Desktop IT integration — design, scheduling, and weekend installation of every workstation connection, so employees arrived Monday to a fully working environment.
Each one of the installs was clean and crisp.

— Project Manager, Enbridge

Tekena delivered the full 300,000 sq ft installation within the 9-month window — absorbing continuous design edits along the way without any impact to the project schedule.

THE RESULTS

Delivered on time. On budget. On spec.

300K

SQ FT DELIVERED

48 HR

RECONFIGURATION WINDOW

15

FLOORS NETWORKED

The completed infrastructure gave Enbridge exactly the dynamic, low-friction workplace it envisioned:

  • Full reconfigurability — cabling, acoustics, walls, and workstations can be changed over a single weekend.
  • Centralized acoustic control — sound levels adjusted across the building from one device.
  • More efficient real estate — unassigned hoteling stations allow more employees per square foot.
  • Zero schedule impact — delivered on time despite continuous mid-project design changes.
Tekena provides the end user with a system that is fully flexible, fully upgradable or downsizeable. They have given Enbridge the choice to do what’s required at a given point in time for their business needs.

— Project Manager, Enbridge

LOOKING FORWARD

Enbridge views flexibility and adaptability as the two defining benefits of the project — advantages that will compound for years. As the organization continues to evolve through mergers, acquisitions, and restructuring, the Tekena infrastructure adjusts with it. Desk reconfigurations and meeting room changes are now routine, fast, and often invisible to day-to-day operations, translating directly into time and cost savings.

It’s not only future-proofed Enbridge, but it has also allowed them to adapt to this new dynamic workplace philosophy.

— Project Manager, Enbridge

Enbridge has identified the Edmonton Centre as the template for upcoming locations — a proven model for delivering flexible, scalable, and resilient workplace infrastructure.